NASA Names Artemis III Crew
The 2027 test mission is designed to validate spacecraft systems ahead of future lunar missions.
The 2027 test mission is designed to validate spacecraft systems ahead of future lunar missions.
The quiet supersonic aircraft reached Mach 1.1 over California.
Aircraft expected to begin faster-than-sound test points this month.
For NASA’s first crewed lunar mission since Apollo, aviation experience is one of the clearest threads linking the astronauts aboard Orion.
The 212-foot rocket component operated ‘exactly as intended’ during around-the-moon launch
Test campaign set to continue soon despite in-flight issues.
Test campaign to move into expanded flight envelope phase.
Envelope expansion phase to begin as aircraft continues flight evaluations.
A new NASA study finds urban residents report higher annoyance from air taxi noise than suburban residents.